Home › Concrete Calculator

Concrete Calculator: How Many Bags or Cubic Yards?

Enter the size of your slab, footing or post holes and get the concrete you need in cubic yards, cubic metres and 40, 60 and 80 lb bags. Every step of the math is shown, so you can check it against your own numbers.

Enter your measurements

Units

Patios and walks are commonly 4 in; driveways 5–6 in.

10%

10% covers spillage, uneven ground and over-excavation.

For high-strength, fast-setting or other brands. Leave blank to skip.

Your estimate

Concrete to order (incl. 10% extra)
1.36 cu yd1.04 m³ · 1.23 cu yd before extra
80 lb bags
62 bags61.1 exact
60 lb bags
82 bags81.5 exact
40 lb bags
123 bags122.2 exact
Bags to buy (rounded up)
BagYield per bagBags per cu ydBags to buy
40 lb0.3 cu ft90123
60 lb0.45 cu ft6082
80 lb0.6 cu ft4562
Show the math, step by step
  1. Volume of the slab10 ft × 10 ft × 0.333 ft (4 in ÷ 12)= 33.33 cu ft
  2. Add extra for waste33.33 cu ft × (1 + 10%)= 36.67 cu ft
  3. Convert to cubic yards36.67 cu ft ÷ 27= 1.36 cu yd (1.04 m³); 1.23 cu yd before waste
  4. 40 lb bags36.67 cu ft ÷ 0.3 cu ft per bag = 122.22, round up= 123 bags
  5. 60 lb bags36.67 cu ft ÷ 0.45 cu ft per bag = 81.48, round up= 82 bags
  6. 80 lb bags36.67 cu ft ÷ 0.6 cu ft per bag = 61.11, round up= 62 bags

Assumptions

  • Bag yields are QUIKRETE Concrete Mix data-sheet values: 40 lb ≈ 0.30, 60 lb ≈ 0.45, 80 lb ≈ 0.60 cu ft. Sakrete standard mix is listed at the same yields. High-strength, fast-setting and high-yield mixes differ; use the yield printed on your bag.
  • 1 cubic yard = 27 cubic feet, so 45 bags of 80 lb, 60 bags of 60 lb or 90 bags of 40 lb make one yard.
  • Waste allowance: 10%. Uneven subgrade, spillage and over-excavation commonly eat 5–10%.
  • Over about 1.5–2 cubic yards, a ready-mix truck is usually cheaper and easier than bags. Most plants have a short-load fee under 3–4 yards, so compare quotes.

How to calculate how much concrete you need

The bag counts use the manufacturer’s published yields (QUIKRETE: 0.30, 0.45 and 0.60 cu ft per bag), and always round up to whole bags. A waste allowance is on by default because pours almost never use exactly the theoretical volume.

  1. Measure the pour. Measure length, width and thickness (or depth) in the same units. Slabs are commonly 4 in thick; footings are often 8 to 12 in deep.
  2. Find the volume. Multiply length × width × thickness in feet (divide inches by 12). A 10 × 10 ft slab 4 in thick is 10 × 10 × 0.333 = 33.3 cubic feet.
  3. Convert to cubic yards. Divide cubic feet by 27. 33.3 ÷ 27 = 1.23 cubic yards.
  4. Add waste. Add 5 to 10% for spillage and uneven ground: 1.23 × 1.10 = 1.36 cubic yards.
  5. Convert to bags. Divide cubic feet by the bag yield (0.60 for an 80 lb bag) and round up: 36.7 ÷ 0.60 = 61.1, so buy 62 bags.

Quick reference

Concrete needed for common slab sizes (4 in thick)
Slab sizeCubic yards80 lb bags (no extra)80 lb bags (+10%)60 lb bags (+10%)
4 × 4 ft0.291014
8 × 8 ft0.79364053
10 × 10 ft1.23566282
10 × 12 ft1.48677498
12 × 12 ft1.788088118
10 × 20 ft2.47112123163
20 × 20 ft4.94223245326

Bag counts use QUIKRETE yields of 0.60 cu ft (80 lb) and 0.45 cu ft (60 lb), rounded up.

Worked examples

All concrete guides

Frequently asked questions

How many bags of concrete are in a cubic yard?

A cubic yard is 27 cubic feet. With QUIKRETE’s published yields that is 45 bags of 80 lb (0.60 cu ft each), 60 bags of 60 lb (0.45 cu ft) or 90 bags of 40 lb (0.30 cu ft). Sakrete’s standard mix is listed at the same yields, but always check the yield printed on your bag.

How many 80 lb bags of concrete do I need for a 10 × 10 patio at 4 inches?

The slab is 33.3 cubic feet (1.23 cubic yards). Divided by 0.60 cu ft per bag that is 55.6, so 56 bags with no allowance for waste, or 62 bags with 10% extra.

Should I add extra for waste?

Yes. Uneven ground, slightly over-dug forms and spillage routinely use 5 to 10% more than the exact volume. Running short mid-pour is worse than having a few bags left over, because a cold joint weakens the slab.

When is ready-mix cheaper than bags?

As a rough guide, once you pass about 1.5 to 2 cubic yards (roughly 70 to 90 bags of 80 lb), compare a ready-mix delivery. Plants often charge a short-load fee under 3 to 4 yards, so get a quote before deciding.

How do I calculate concrete for a round column or post hole?

Use π × (diameter ÷ 2)² × height. A 12 in diameter column 8 ft tall is π × 0.5² × 8 = 6.28 cubic feet, or 11 bags of 80 lb before any waste allowance. Choose “Round column, tube form or post hole” above and enter how many you need.

How thick should a concrete slab be?

Patios, walkways and shed bases are commonly poured 4 in thick; driveways and garage floors often 5 to 6 in. Local codes and soil conditions can require more, so check with your building department.

Related calculators

Sources and assumptions

Typical densities are planning values, not test results for a specific quarry. See the methodology page for every constant and formula.

These calculators give estimates for planning. Materials vary by brand, moisture and site conditions. Confirm with your supplier and building department before ordering or pouring.