How Many Pavers in a Pack?
A pack of 100 pavers covers 22 sq ft if they are 4 × 8 in, 100 sq ft if they are 12 × 12 in. Enter the size and the count printed on your pack to see its coverage.
Calculator
Your estimate
- Area one pack/pallet covers
- 22.2 sq ft2.1 m² · 4.5 pavers per sq ft
- Packs / pallets to buy
- 5 packsfor 100 sq ft with 10% waste
Show the math, step by step
- Pavers per square foot
144 sq in ÷ (4 in × 8 in)= 4.5 per sq ft - Area covered by one pack
100 pavers ÷ 4.5 per sq ft= 22.2 sq ft - Pavers needed for your area, with waste
100 sq ft × 4.5 × (1 + 10%)= 495 pavers - Packs to buy
495 ÷ 100, round up= 5 packs
Assumptions
- Pack and pallet counts differ by manufacturer, size and thickness: enter the number printed on your pack or pallet tag.
- Paver size is the nominal face size including spacer bumps.
How the answer is worked out
- Start with the prefilled numbers. The calculator below is set up for a pack or pallet of pavers. Change any number to match your project.
- Pavers per square foot. 144 sq in ÷ (4 in × 8 in) = 4.5 per sq ft.
- Area covered by one pack. 100 pavers ÷ 4.5 per sq ft = 22.2 sq ft.
- Pavers needed for your area, with waste. 100 sq ft × 4.5 × (1 + 10%) = 495 pavers.
- Packs to buy. 495 ÷ 100, round up = 5 packs.
Pavers per square foot by size
| Paver size | Per sq ft | Sq ft per 100 pavers |
|---|---|---|
| 12 × 12 in | 1 | 100 |
| 16 × 16 in | 0.56 | 177.8 |
| 24 × 24 in | 0.25 | 400 |
| 4 × 8 in | 4.5 | 22.2 |
| 6 × 9 in | 2.67 | 37.5 |
| 6 × 6 in | 4 | 25 |
| 12 × 24 in | 0.5 | 200 |
| 18 × 18 in | 0.44 | 225 |
Pack and pallet counts differ by manufacturer, so this table gives coverage per 100 pavers: scale it by the count on your pack.
Frequently asked questions
How many pavers in a pack?
A pack of 100 pavers covers 22 sq ft if they are 4 × 8 in, 100 sq ft if they are 12 × 12 in. Enter the size and the count printed on your pack to see its coverage.
How much gravel base do i need for pavers?
ICPI recommends at least 4 in of compacted aggregate base under patios and walks (6 to 8 in under residential driveways, more over weak soil or in freeze-thaw climates). Because the base is compacted, you buy about 25% more loose stone than the finished volume: 1.54 cubic yards (2.31 tons of crusher run) per 100 sq ft at 4 in. For this page’s patio, see the base figure in the estimate above.
How much paver sand for patio?
The bedding layer is about 1 in of screeded, uncompacted sand (ICPI), which is 8.3 cubic feet, 0.31 cubic yards or about 17 bags of 0.5 cu ft per 100 sq ft. Use concrete sand, not mason sand or stone dust. Joint sand to sweep between the pavers is extra.
How many pavers do i need for a fire pit?
It depends on the design, and most fire pits are built from retaining-wall blocks rather than flat pavers. For a ring, blocks per course ≈ circumference ÷ block face length, where circumference = π × the diameter measured through the middle of the blocks: a 36 in diameter ring is about 113 in around, so about 10 blocks per course with 12 in long blocks. Multiply by the number of courses, and follow the block maker’s fire-pit instructions.
More paver guides
- How Many 12x12 Pavers for an 8x8 Patio
- How Many 16x16 Pavers for a 12x12 Patio
- How Many 16x16 Pavers for a 20x20 Patio
- How Many 12x12 Pavers for a 10x10 Patio
- How Many 16x16 Pavers for a 10x10 Patio
- How Many 16x16 Pavers for an 8x8 Patio
- How Many 16x16 Pavers for a 10x12 Patio
- How Many 12x12 Pavers for a 10x12 Patio
Sources and assumptions
- ICPI / CMHA Tech Spec 2 and Tech Spec 10: base and bedding sand thickness
- QUIKRETE Concrete Mix No. 1101 data sheet (yield per bag)
- shedmath.com: 32 online calculators tested (packed-base 25% rule, bag counts)
- Typical loose densities: tradesmancalculator.com material weight chart (compiles Engineering ToolBox, OSU/WSU Extension, EPA)
Typical densities are planning values, not test results for a specific quarry. See the methodology page for every constant and formula.
Need different dimensions? Use the full Paver Calculator.
Estimate only. Bag yields and densities are typical values: see the methodology.